Welcome to the first podcast for the Interstate 30 Mobility Task Force.
Right-click this link and choose ‘Save Target As’ (or ‘Save Link As’). Podcast transcription (PDF).
The I-30 Mobility Improvement Project seeks to reduce congestion and improve regional mobility by expanding capacity along I-30.
| Icon Key | ||
|---|---|---|
work starting soon |
current closure(s) |
freeway camera |
The following table displays the same work status and lane closure information as on the map above. For more detail on upcoming road work, see the Current Road Work page.
| Road Segment | Status | Work |
|---|---|---|
| I-30 Westbound Mainlanes | There are no planned closures. |
|
| I-30 Eastbound Mainlanes | There are no planned closures. |
|
| I-30 Eastbound Ramp
Entrance @ FM 157/Collins Street |
![]() |
FM 157/Collins Street entrance ramp is closed. Alternate entrance ramps are at Cooper Street and the intersection of Copeland Road and Convention Center Drive. |
| I-30 Eastbound Ramp
Entrance @ Nolan Ryan Expressway |
![]() |
Nolan Ryan Expressway entrance ramp is closed. Alternate entrance ramp is located at the intersection of Copeland Road and Convention Center Drive. |
| I-30 Eastbound Ramp
Exit 29 @ Ballpark Way |
![]() |
Ballpark Way exit is permanently closed. Use FM 157/Collins Street or Nolan Ryan Expressway as alternate exits. |
| FM 157/Collins Street | ![]() |
Southbound right lane on bridge is closed. |
| Center Street | ![]() |
The extension of Center Streeet north of Road to Six Flags Drive is closed. |
| Copeland Road | ![]() |
Copeland Road westbound is reduced to one lane approaching, through, and after the Convention Center Drive intersection. May 5 through June: the eastbound outside lane of Copeland Road between FM 157/Collins Street and Nolan Ryan Expressway will be closed as gas line crews work in this area. This work and the associated lane closure should last several weeks. |
| Wet-N-Wild Way | ![]() |
June 30 through mid-August: Wet-N-Wild Way will be closed from FM 157/Collins St to the southwestern driveway of Country Inn & Suites for complete pavement reconstruction.. |
| Ryan Plaza | ![]() |
July through August: The section between Lincoln Dr and Guitar Center is closed as crews work to place new permanent pavement connecting Center Street to FM 157/Collins Street. |
For more information, please email the I-30 Mobility Coordinator.